Manager / Senior Manager – Projects (BESS)

  • image1
    Full Time
  • image2
    Gurugram

Reports To: Head – Projects
Function: Technical leadership & cross-functional coordination for end-to-end deployment, integration and commissioning of Battery Energy Storage Systems (BESS) across Sunsure Energy’s solar, wind and hybrid projects.

Role Overview

Sunsure Energy is scaling rapidly in utility-scale storage as part of its hybrid and standalone BESS portfolio. The Manager/Senior Manager – Projects (BESS) will serve as the central technical authority withing the Projects function for all BESS deployments – guiding Project Managers / Project Execution, D&E, SCM and the Approvals team to ensure that every technical requirement is communicated, implemented and validated on the ground.

This is not a site execution role. It is a technical project leadership role combining engineering oversight, OEM/vendor coordination, design-to-execution translation, and cross-functional project governance.

Key Responsibilities
  • Technical Planning & Design Interface
    • Translate Sunsure’s BESS specifications into clear technical guidelines for site PMs and EPCs.
    • Review & validate engineering documents (SLDs, GA, GTPs, functional specs) with D&E team.
    • Verify PCS–BMS–EMS compatibility, container specs, HVAC/fire systems, grounding, auxiliary loads.
    • Evaluate design readiness for civil/structural components: pads, foundations, trenching, MCC/SCADA rooms.
    • Participate in design reviews with OEMs, EMS/SCADA partners and EPCs; recommend changes where needed.
  • Execution Guidance & Deployment Oversight
    • Guide Project Managers on BESS-related installation, erection and commissioning requirements.
    • Prepare and issue SOPs, checklists and quality protocols for:
      • Container placement & mechanical installation
      • Electrical integration, cabling, terminations, PCS wiring
      • Fire suppression & HVAC systems
    • Ensure technical issues raised at site are resolved quickly with OEMs and internal design teams.
    • Validate readiness of infrastructure before equipment arrival (pads, crane access, power availability, IT/SCADA readiness).
  • Vendor & OEM Coordination
    • Track FAT/SAT results, review reports, and ensure closure of punch points.
    • Support SCM in technical evaluation, delivery scheduling, warranty/performance guarantee reviews and monitoring vendor performance throughout deployment.
  • Grid Integration, Commissioning & Regulatory Interface
    • Coordinate pre-commissioning, functional testing, interlock checks, EMS logic validation and SCADA integration.
    • Act as technical liaison for CTUIL/STU/DISCOM discussions related to: Protection & metering requirements, Charging/discharging permissions, SLDC telemetry compliance
    • Maintain complete documentation for certifications, audits and O&M handover.
  • Safety, Quality & Compliance
    • Develop and enforce BESS-specific safety protocols for Battery handling, Electrical/HV safety, Fire detection & suppression, Thermal runaway management, Emergency response procedures
    • Ensure adherence to CEA/CEIG regulations, Sunsure OH&S guidelines and OEM-recommended safety norms.
Required Experience & Background

Essential

  • 8–12 years total experience with 2–8 years in BESS projects
  • Good technical understanding of:
    • o Battery racks, BMS, thermal & fire systems
    • o PCS, transformers, switchgear, HV/LV equipment
    • o EMS/SCADA, communication protocols
    • o Protection and grid-synchronisation requirements
  • Experience working with top BESS OEMs/PCS suppliers/EPCs preferred.
  • Education: BE/B.Tech (Electrical/Electronics/Power Systems). M.Tech preferred but not mandatory.
What Success Looks Like in 12 Months
  • Zero-safety-incident BESS deployment across Sunsure’s sites.
  • Smooth technical coordination across SCM, D&E, Approvals and PM teams.
  • On-time, on-cost commissioning of storage assets.
  • Strong OEM engagement, predictable delivery & integration.
  • A complete Sunsure BESS Playbook-SOPs, design standards, commissioning protocols.
  • Demonstrated ability to scale Sunsure’s storage program from 100 MWh to 1 GWh+ annually.
To Apply, Please fill out the form below and our team will get back to you shortly.

    Maximum file size limit is 5 MB. Supported file formats: jpg, jpeg, pdf, doc, txt
    To Apply, Please fill out the form below and our team will get back to you shortly.

      Maximum file size limit is 5 MB. Supported file formats: jpg, jpeg, pdf, doc, txt